How to calculate the volume of concrete required for column section?

Photo of author

By Shravan

Contents

How to calculate the volume of concrete required for column section?

Column is the vertical element in the building structure generally it is used to transfer the load like gravity loads (dead load, live load and floor load) and lateral loads (seismic load or wind load) to the foundation. Depending upon the number of floors the dimensions of the column section are varies. As per the IS code standards the minimum dimensions of the column section is taken as 9”X9” or 230mmX230mm value. The sizes of column section for various floors are explained in my previous post please read by using link shown below section. In this article you can able to learn how to calculate the volume of the concrete required for the one single column section with various examples.

Column sizes for various floors in RCC building

The volume of the concrete is the total mixture of cement, fine aggregates, coarse aggregates and suitable amount of the water in the specified grade of the concrete like M15, M20 or M25 grades.

volume of concret
G+2 building with columns
concrete volume
General 12X14 column building

Cases considered for calculation of volume of concrete

Case 1: Column of Square shape which is having 9”X9” or 230mmX230mm dimensions.

Case 2: Column of rectangular shape which is having 9”X12” or 230mmX300mm dimensions.

Case 3: Column of Square shape which is having 12”X12” or 300mmX300mm dimensions.

Case 4: Column of rectangular shape which is having 12”X14” or 300mmX360mm dimensions.

Calculation of volume of concrete required for single column in the building construction

Case 1: Column of Square shape which is having 9”X9” or 230mmX230mm dimensions.

Let us consider M20 grade concrete mix ratio which is having mix proportion of 1:1.5:3 with W/C of 0.4.

By taking height of the column approximately 10’0” height by converting the value in to meter it will get 3.048 meters.

Volume of column = 0.23X0.23X3.048 = 0.16124m3

Now we have Density of column = mass of the column / volume of the column

And Mass = Density X Volume

Since we have density of RCC concrete = 2500 kg/m3

Mass = 2500X0.16124

=403 kgs

The total concrete required for the entire column of 9”X9”X10’0” dimensions is 403 kgs.

Case 2:  9”X12” or 230mmX300mm section

M20 concrete mix ratio is 1:1.5:3 with W/C of 0.4.

Volume of column = 0.23X0.3X3.048 = 0.2103m3

Now Density = mass / volume

And Mass = Density X Volume

Since we have density of RCC concrete = 2500 kg/m3

Mass = 2500X0.2103

=526 kgs

The total concrete required for the entire column of 9”X12”X10’0” dimensions is 526 kgs.

Case 3:  12”X12” or 300mmX300mm section

M20 concrete mix ratio is 1:1.5:3 with W/C of 0.4.

Volume of column = 0.3X0.3X3.048 = 0.27432m3

Now Density = mass / volume

And Mass = Density X Volume

Since we have density of RCC concrete = 2500 kg/m3

Mass = 2500X0.27432

=685.8 kgs

The total concrete required for the entire column of 9”X12”X10’0” dimensions is 685.8  kgs.

Case 4:  12”X14” or 300mmX360mm section

M20 concrete mix ratio is 1:1.5:3 with W/C of 0.4.

Volume of column = 0.3X0.36X3.048 = 0.329184m3

Now Density = mass / volume

And Mass = Density X Volume

Since we have density of RCC concrete = 2500 kg/m3

Mass = 2500X0.329184

= 822.96kgs

The total concrete required for the entire column of 9”X12”X10’0” dimensions is 822.96kgs.

concrete volume
Volume calculation for various columns

Final results of volume calculation

The below table shows the complete calculated values of volume of concrete and material quantities used with different column sizes

S. No Column size in mm Volume of concrete Weight of concrete required
1 230X230 0.16124m3 403 kgs
2 230X300 0.2103m3 526 kgs
3 300X300 0.27432m3 685.8 kgs
4 300X360 0.329184m3 822.96kgs

Follow our previous posts here

How many bags of cement required for slab construction

Basic concepts of bar bending scheduling [BBS] used in building construction

What are bracings ? and different types of bracing system used in building design?

Design requirements of RCC slab as per IS code standards

Basic rules in foundation design as per standards

Conclusions of volume of concrete required for column construction

Well now the above explained concepts are related to the volume of the concrete needed for the RCC column construction. For this it was assumed four types of columns which are having 230X230, 230X300, 300X300, 300X360dimensions.In case of 230mmX230mm minimum dimensions it was obtained as 0.16124m3 volume of the concrete and 403 kgs of concrete, In case of 230mmX300mm minimum dimensions it was obtained as 0.2103m3 volume of the concrete and 526 kgs of concrete, In case of 300mmX300mm minimum dimensions it was obtained as 0.2103m3 volume of the concrete and 685.8 kgs of concrete and finally for the  300mmX360mm minimum dimensions it was obtained as 0.329184m3 volume of the concrete and 822.96kgs of concrete.

For more information regarding the civil engineering concepts please follow my YouTube channel Civil Engineering by shravan.

Thank you,