What is construction cost for residential building per square feet area | cost of construction for 1000sft area | cost estimation of building

Photo of author

By Shravan

Contents

What is the total construction cost for residential building ? cost of construction for 1000sft area ?

The total construction cost is the total price required to build a structure or building. The cost of the project will be depending upon the various factors like material quality, structure type, and client requirements.

In this article I will explain you how to calculate the total construction cost for 1000sft area building. An average for square feet area it is required approximately 1600 Indian rupees to 1800 Indian rupees.

The total cost of project is mainly depending upon the quality of materials using to build structure.

Quality of materials in construction cost  

For building construction we will use materials like cement, sand, aggregates, wood, bricks, etc. For example if we use low quality materials for construction it will take approximately 1600 Indian rupees per square feet and at the same time if we use good quality materials it will take 1800 Indian rupees per square feet area as per 2021 norms.

Example if the project is assumed to construct with good quality materials so the cost is taken as 1800 Indian rupees.  The 1000 sft area the total cost required is calculated below

Total cost of Project    = Area of slab X Rate per square feet

= 1000X1800

Approximately 1800000 Indian rupees (18Lakhs)

Construction cost for various works or categories

The cost of the construction for building is classified in to various works or categories

  1. Excavation and filling
  2. Foundation
  3. Construction up to plinth beam level
  4. Super structure work
  5. Roofing including water proofing
  6. Flooring
  7. Wood work
  8. Internal finishers
  9. External finisher
  10. Water supply
  11. Sanitary work
  12. Electrical work

Excavation and filling

Excavation is the process of digging the soil for foundation construction and filling is the process of filling the soil after constructing foundation. For this process approximately it will take 3 percentage of total construction cost.

For the excavation and filling an average of 3% total constriction cost is required. Here total cost is 1800000 Indian Rupees.

So, Cost for excavation and filling     = (3/100) X 1800000

=54000 Indian rupees.

Foundation

Foundation is the structure which is constructed under the ground to resist the building structure above the ground. For this process approximately it will take 6 percentage of total construction cost.

For foundation cost required              = (6/100) X 1800000

=108000 Indian rupees

Construction cost up to plinth beam level

Plinth level is the beam sections we are resisting on the ground and which are attached to the vertical column sections. Basically the total load from the various sources initially transfer to slab through the slab section it will transfer to beams and plinth beams. For  plinth beam construction also it is required 6% of the total construction cost.

plinth level in building
Plinth level in Construction site

Construction up to plinth beam level cost    = (6/100) X 1800000

=108000 Indian rupees

Super structure work

The super structure is the building which is constructed above the plinth level mainly brick work, column construction, plastering comes under this category. For this super structure work it is required 22 percentage of total cost for construction.

Super structure in building
Super structure after construction

Super structure work cost                               = (22/100) X 1800000

=396000 Indian rupees.

Roofing including water proofing

Roofing including water proofing in this case it included slab construction with water proofing material with plastering. For this category it is required approximately 16 percentage of total cost for construction this will includes the materials cost also.

Roofing including water proofing                 = (16/100) X1800000

= 288000 Indian rupees.

slab making process for building
Mixing concrete for slab construction

Flooring work

Flooring is the marble of tiles work used inside the building structure. Depending upon the type of marble and tiles it will increases the cost of project, an average of 5% of total cost of project is required for this case for the building.

Marbles used in building design
Marbles for construction

Flooring work cost                              = (5/100) X 1800000

= 90000 Indian rupees.

Wood work

Basically for the doors, windows, ventilation purpose we will use wood work. For  better construction class 1 teak wood is used , depending upon class the cost will various,  2 or  3 classes  cost is less when we compare with class 1case.

The complete wood work in the building it is required approximately 12 percentage of total cost of the project.

wood work total cost                   = (12/100) X 1800000

=216000 Indian rupees.

Internal finishers

Internal finishers are mainly related to internal painting, fall sealing and some of the other wash area interior design etc. For this work it is required approximately 8% of the total cost. The cost required for this case is calculated below.

For internal finishers total cost           = (8/100) X 1800000

=144000 Indian rupees.

External finishers

The works related to the external paining, elevation work and some other extra works is considered in this case. For this particular work it is required approximately 3% of the total cost, the complete calculation is shown in the below.

For external finishers total cost           = (3/100) X 1800000

=54000 Indian rupees.

Water supply

The water supply is also an important aspect in building design. Under this category the water tank construction over the slab, water supply connections for the building is considered. An average of 6 percentage of total cost is required under this case. The calculation for the water supply is shown below.

Water supply cost                               = (6/100) X 1800000

= 108000 Indian rupees.

Sanitary work

The sanitary work related to the pipe line system and other connections of water comes under this category. For the sanitary work approximately it is required 8% of the total cost of the project in this case, the below shown calculations related to the sanitary work for building of 1000sft are.

Sanitary work cost                              = (8/100) X 1800000

= 144000 Indian rupees.

Electrical work  

The complete electrical work related to the electricity wiring, pipe line comes under this category for this respected category it is required approximately 5% of the total cost of the project under this case. The calculation part is shown in the below,

Electrical work cost                            = (5/100) X 1800000

= 90000 Indian rupees.

Construction cost for 1000 square feet area

The complete construction cost for 1000 square feet area are shown in the below table with percentages.

S. No

Item of work Percentage required Cost required in Indian rupees

1

Excavation and filling 3

54000

2

Foundation 6

108000

3

Construction up to plinth beams 6

108000

4

Super structure work 22

396000

5

Roofing including water proofing 16

288000

6

Flooring 5

90000

7

Wood work 12

216000

8

Internal finishers 8

144000

9

External finishers 3

54000

10

Water supply 6

108000

11 Sanitary work 8

144000

12

Electrical work 5

90000

Total 100%

1800000 Rupees

construction cost per square feet area
Flow chart construction cost

The complete concepts of construction cost for building is shown in my YouTube channel please click here to see.

Conclusions for construction cost for residential building

Well now the above explained concepts are related to the construction cost for residential building for 1000 sft slab area.

It is dived in to 12 categories related to the Excavation and filling, foundation, construction up to plinth level, super structure work, roofing including water proofing, flooring, wood work, internal finishers, external finishers, water supply, sanitary work and electrical work.

For 1 sft area it is required 1600-1800 Indian rupees for building.  Please watch interesting concepts in my YouTube channel Civil engineering by shravan. Please feel free to text us at contact us page for any quarries.